ROOF&WALL
»
»
»
»
»
»
Aluminum Trapese
»
Natural Galvanize
»
   


 ERGÜVEN İNŞAAT TAAHHÜT
  SAN. ve TİC. LTD. ŞTİ.
 Addr. : 1348 sokak No:3/P-23
    Yenişehir,İzmir TURKEY
Phone : +90.232.469 91 22
+90.232.469 91 23
+90.232.469 91 24
 Fax : +90.232.469 91 25
 E-mail : info@erguveninsaat.com
Polyurethane Sandwic Panels

ASSEMBLY PHASE

» MASTER PANEL ASSEMBLY
 
Screws Assembly Closing the Cap Closing the Cap
Implementation of
Lower Flat Ridge
Lower Flat Ridge Assembly
Radius Ridge Assembly
 
 
Protect the material from sling crushing during lifting it by crane and place the lower transporters appropriately
 
If the ordered panel is short lift it from its both ends, but if it is long lift it from its both ends and the central part, do not pull it. Pulling will especially cause scratches on dyed panels.
If panels will be stored in the site for a long time, store them in an interior place.
 
When they will be stored for a short time, protect them from external factors, select a very low-sloped area for protecting it from water accumulation, if possible.
 

 
T.C.M.B EXCHANGE
Dolar($) : 1.2448
Euro(€)  : 1.9304

meslektaşıma tavsiye et
broşür gönder
assan panel yetkili bayi
© 2005 Copyright Ergüven Insaat Taahhüt San. ve Tic.Ltd.Sti       |      Web design Netport